Boiler and Pressure Vessel Safety: ASME Design Codes and South African Regulatory Compliance (PER / SANS 347)
Master Boiler and Pressure Vessel Safety: ASME Design Codes and South African Regulatory Compliance (PER / SANS 347). Practical CPD training for engineers and technicians.
- Online – Microsoft Teams
- 28–29 September 2026
- 2 CPD Points
- Price : R8 999.00

LEARNING OUTCOMES
After successfully completing this course, you will be able to:
Explain the South African legal framework governing pressure equipment: OHS Act, PER, SANS 347, SANS 10227
Understand the role, accreditation, and legal standing of Approved Inspection Authorities (AIAs) under SANS 10227
Understand and apply Risk-Based Inspection (RBI) under PER Regulation 12 to justify extended inspection intervals
Explain the structure and purpose of ASME BPVC Sections I, II, V, VIII and IX as recognised design/construction codes under SANS 347 Annex A
Plan and support internal, external, and in-service inspections in line with PER and SANS 347 intervals
Build an integrated boiler/pressure vessel integrity management programme suited to a South African operation
South African Legal Framework for Pressure Equipment
- Occupational Health and Safety Act 85 of 1993 — scope and enforcement
- Pressure Equipment Regulations (PER), GN R734 of 2009 — structure and key duties (manufacturer, user, AIA)
- SANS 347: purpose, scope, and relationship to the PER
- SANS 10227: accreditation criteria for Approved Inspection Authorities (AIAs)
- Role of SANAS accreditation and the Department of Employment and Labour (Chief Inspector)
- Historical incidents in South Africa and why enforcement matters
- How this framework differs from — and where it references — international codes (ASME, PED)
SANS 347 Categorisation and Conformity Assessment
- Pressure equipment categories (Category I–IV) based on volume, pressure, and fluid group
- Sound Engineering Practice (SEP) vs. categorised equipment
- Conformity assessment routes by category
- Annex A: recognised codes of construction — where ASME Section I / VIII fits alongside PED and others
- Declaration of Conformity requirements
ASME Design Codes as Applied under SANS 347
- ASME BPVC structure: Section I (Power Boilers), Section VIII (Pressure Vessels, Div. 1/2/3), Section II (Materials), Section V (NDE), Section IX (Welding)
- Design pressure, design temperature, and MAWP
- Material selection: allowable stress, toughness, and service limitations
- Welded joint categories and joint efficiency
- Reading a Manufacturer's Data Report (MDR) and ASME nameplate/stamping
- How local design engineers/verification engineers sign off on designs done outside South Africa (per SANS 347 provisions)
Fabrication, Welding, and Quality Control
- Fabrication requirements under ASME Section I / VIII
- Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR) — ASME Section IX
- Welder performance qualification
- SANS 3834/ISO 3834 welding quality requirements (as referenced in SANS 347)
- Quality control systems and manufacturer certification (hold points, inspection release notes)
- Common fabrication defects and their significance
Approved Inspection Authorities and In-Service Inspection
- Role and legal standing of the AIA under the PER
- SANS 10227 accreditation criteria and scope of activity
- Inspection types: initial (post-installation), periodic internal/external, hydraulic pressure testing
- Standard inspection interval — internal/external inspection and hydraulic test not exceeding 36 months (SANS 347), and how this can vary by category and condition
- User responsibilities: cessation of use where a defect endangers safety, until rectified to the AIA's satisfaction
- Working with your AIA: scheduling, access, scope agreement, and reporting
Planning and Conducting Inspections
- Pre-inspection planning: history review, prior findings, isolation and entry requirements
- External inspection: structural supports, safety devices, piping connections, corrosion/leak evidence
- Internal inspection: entry procedures, cleaning requirements, systematic examination sequence
- Safety and relief valve inspection, testing, and calibration certification
- Inspection documentation: what the AIA expects to see and sign off on
Degradation Mechanisms and Defect Recognition
- Corrosion mechanisms: general, pitting, under-deposit, caustic gouging, acid attack
- Erosion and erosion-corrosion
- Creep and long-term overheating damage
- Fatigue: thermal and mechanical
- Hydrogen damage and embrittlement
- Stress corrosion cracking
- Weld and heat-affected-zone defects
- Fireside vs. waterside/process-side degradation patterns
Nondestructive Examination (NDE) in Practice
- Visual examination (VT) — the foundation of every inspection
- Ultrasonic thickness testing (UT) and wall-loss mapping
- Magnetic particle testing (MT) and liquid penetrant testing (PT)
- Radiographic testing (RT) — applications and limitations
- Selecting the right NDE method for the degradation mechanism and location
- Interpreting NDE results against code acceptance criteria
- NDE personnel qualification expectations under SANS 347/PER
Repairs, Modifications, and Rerating
- Defining a repair vs. a modification under the PER
- When re-verification and re-certification by an AIA is triggered
- Welding requirements for repairs: WPS/PQR applicability, welder qualification
- Common repair methods: weld build-up, patching, sleeving, lap patches
- Rerating considerations: pressure, temperature, and capacity changes
- Certificate of manufacture and post-repair documentation requirements
- Working with your AIA during repair/modification work
Fitness-for-Service and Rerating Principles
- Introduction to fitness-for-service (FFS) concepts (API 579 / ASME FFS-1 overview)
- Evaluating localised wall loss and remaining life
- Assessing weld defects and crack-like flaws against acceptance criteria
- When to repair, monitor, rerate, or retire equipment
- Remaining life estimation basics and inspection interval adjustment
Risk-Based Inspection under PER Regulation 12
- PER 12: extending in-service inspection/testing intervals through an RBI management system
- Determining inspection scope and content based on risk
- Building an RBI case: consequence and likelihood assessment
- Integrating RBI outcomes with AIA sign-off and jurisdictional acceptance
- Documentation required to support an RBI-based interval extension